All new connections to the WEVD water system must complete a hook-up application and meter request form. All new construction is required to be metered.

  • When completing these forms, please use your Waterville Estates address
  • The $1,000 new connection fee must be included with the completed hook-up application along with all attachments
  • Both forms are to be returned to the WEVD Water Department via:
    Mail - 562 Winterbrook Rd, Campton NH 03223
    Email - a.smith@waterville-estates.com

Summary of Terms and Conditions for New Connections

This is not meant to be a complete or comprehensive list of the terms and conditions for new water connections within the Waterville Estates Village District

New Connections

  • No new connections shall be made until the required application is submitted and approved by the WEVD Commissioners, any applicable fees paid, and necessary inspections have been completed (pg. 8-9, sec. 5, sec. 7)
  • A $1,000 new connection fee is due at the time the permit is issued
  • Of the new connect fee, $250 is a non-refundable administrative service charge
  • Permits are only valid for 60 days and are nontransferable

Metering

  • All new connections will be required to be metered and water service will not be provided until a meter is installed (pg. 9, sec. 7)
  • Meters shall be provided within 15 days of the receipt of request for a meter following the inspection of service lines has been approved by a District representative (pg. 9, sec. 7)

Service Lines

  • Services lines from the curb stop to the building are the sole responsibility of the owner to maintain (pg. 10, sec. 9, b)
  • The minimum diameter for service lines to a single-family residence is 1 inch (pg. 10, sec. 9, c)
  • All service lines must conform to AWWA Standards, ANR Water Supply Division rules and technical standards, New Hampshire Statutes, and District standards (pg. 10, sec. 9, c)
  • When rate flow will exceed 15 gallons per minute the District may require services lines to be greater than 1 in. in diameter (pg. 10, sec. 9, c)

Extending Service

  • The application process and requirements for the extension of service mains can be found on page 16, section 32 “Water Main Extension, Plan Approval, Construction”
  • All cost for extending water service to an individual property is the responsibility of the property owner (pg. 9, sec. 7)
  • “New service or extension of mains shall not be constructed during the period November 15 to April 15 without prior cold weather construction approval of the District. The owner may be assessed an additional charge as part of the connection fee to cover the additional expense incurred as a result of cold weather construction.” (pg. 11, sec. 12)